PMP考試每天一練--PMP考試試題-43
|
PMP考試試題一: Effective communication is vital for project success. Scope changes,constraints, assumptions, integration and interface requirements, overlapping roles and responsibilities, and many other factors all pose communications challenges.The presence of communication barriers is most likely to lead to。 A. Reduced productivity B. Increased hostility C. Low morale D. Increased conflict 有效的溝通對于項(xiàng)目的成功至關(guān)重要。范圍變更、限制條件、假設(shè)、整合與界面要求,重疊的角色和責(zé)任以及其它許多因素都對溝通提出了挑戰(zhàn)。溝通上的障礙很可能導(dǎo)致: A. 生產(chǎn)力下降 B. 敵意增強(qiáng) C. 士氣低落 D. 沖突增加 PMP參考答案:D. 沖突增加 PMP答案解析:規(guī)劃溝通管理引言(10.1) P289 PMP考試試題二: During the Plan Risk Management process of a major project, the project manager is informed that her key subject matter experts are currently spread around the globe. All experts are available via e-mail and planning must not be delayed. What is the BEST method for gathering information? A. Brainstorming. B. Delphi technique. C. Assumption analysis. D. Cause and effect diagramming. 某一重大項(xiàng)目處于規(guī)劃風(fēng)險(xiǎn)管理階段。項(xiàng)目經(jīng)理被告知,項(xiàng)目的關(guān)鍵問題專家現(xiàn)在都派往全世界各地了,他們只能通過郵件方式給出建議,而且計(jì)劃不能延誤。收集信息的最佳方法是什么? A.頭腦風(fēng)暴。 B.德爾菲技術(shù)。 C.假設(shè)分析。 D.因果圖。 審題: 此題的關(guān)鍵字為“規(guī)劃風(fēng)險(xiǎn)管理階段”和“收集信息”和“項(xiàng)目的關(guān)鍵問題專家現(xiàn)在都派往全世界各地了,他們只能通過郵件方式給出建議”,意思就是項(xiàng)目處于風(fēng)險(xiǎn)管理中的規(guī)劃過程組,考查的是工具中的信息收集的技術(shù)。 定位: 規(guī)劃過程組·風(fēng)險(xiǎn)管理·11.2.2 識別風(fēng)險(xiǎn):工具與技術(shù) 解析: 此題可以使用頭腦風(fēng)暴、面談和德爾菲技術(shù)。但由于專家們都分散在全球各地,所以使用頭腦風(fēng)暴和面談法不切合實(shí)際。 答案:B.德爾菲技術(shù)。 |




