PMP考試每天一練--PMP考試試題-19
|
PMP考試試題一: Due to a lack of an employee training and proper production control, defects in a production run caused rework which cost the company $250,000. How much of this cost is directly attributable to the employees on the production line? A. $75,000 B. $37,500 C. $212,500 D. $145,000 由于員工缺乏培訓(xùn)和適當(dāng)?shù)纳a(chǎn)控制,生產(chǎn)過(guò)程中發(fā)現(xiàn)了錯(cuò)誤需要返工解決。返工成本為$250,000。其中員工負(fù)有責(zé)任的成本為 A. $75,000 B. $37,500 C. $212,500 D. $145,000 PMP參考答案:B. $37,500 PMP答案解析:質(zhì)量責(zé)任 PMP考試試題二: 統(tǒng)計(jì)抽樣是實(shí)施質(zhì)量控制的一種方法,用以確定項(xiàng)目的某個(gè)組成部分或產(chǎn)品符合要求的程度。其最大優(yōu)勢(shì)在于它____。 a.無(wú)須耗用大量資源 b.足夠準(zhǔn)確,且取樣不足1% c.為得出對(duì)總體的令人滿(mǎn)意的推斷, d.只有當(dāng)發(fā)現(xiàn)最終產(chǎn)品出現(xiàn)問(wèn)題時(shí),無(wú)須對(duì)組成部分進(jìn)行100%的檢查或者顧客退貨時(shí),才需要進(jìn)行抽樣 PMP正確答案:C |




