PMP考試章節練習-整體管理11-20

轉載者:PMP團購網      發布時間:2014/7/26        點擊: 3636

11. All projects should be supportive of the performing organization’s long term goals. These types of goals are best describes as:
A. Operational
B. Tactical
C. Strategic
D. Bottom-Up
所有項目都應該支持執行組織的長期目標。對這種類型的目標最貼切的描述是:
A. 運作的
B. 戰術的
C. 戰略的
D. 自上而下的

12. Within the five overlapping process groups of: initiating, planning, executing, controlling, and closing, which processes dominates in all project phases?
A. Initiating and Planning
B. Executing and Controlling
C. Planning and Controlling
D. They are all essential in each phase
在五個重疊的過程:啟動、計劃、執行、控制和收尾中,哪一項在項目階段中占主導地位?
A. 啟動和計劃
B. 執行和控制
C. 計劃和收尾
D. 都很重要

13. Why is it more difficult to determine when a change occurs on a project that is using a reimbursable type contract as compared to a lump-sum contract?
A. The detailed scope of work is not fully defined.
B. On reimbursable contracts, the contractors wants lots of changes.
C. The client usually creates the changes on a lump sum type contract.
D. The contractor determines if there are any changes to approve.
為什么報銷型合同比付款型合同更難確定項目何時發生變更?
A. 沒有充分定義詳細的工作范圍
B. 在報銷型合同中,承包商總是想要更多的變更
C. 客戶通常在一次性付款合同中提出變更
D. 承包商決定是否有任何變更需要批準

14. When should a change request be documented?
A. The change is introduced into the normal workflow and the documentation is provided after the work is completed.
B. The work authorization is given upon the request of the client and documented at its occurrence.
C. Due to time constraints or the belief that it would be foolish to have to redo any additional work as a result of the change, the change is incorporated first and the documentation is prepared after the change is completed.
D. Client and contractor jointly document and approve the change before the work is scheduled.
什么時候要把變更申請寫成文檔?
A. 已經把變更介紹到正常的工作流中,并且在工作完成后提交書面文檔
B. 在收到客戶的申請并得到工作授權后
C. 由于時間限制或者認為變更的結果就是返工而且這么做是不明智的情況下,首先需要把變更集中起來,然后在變更完成之后再寫出文檔
D. 在工作被安排到進度計劃中之前,客戶和承包商協商變更內容

15. Changes are difficult and cumbersome to incorporate with the complex systems used by contractors. What is the reason for this difficulty?
A. The lack of detail available information concerning the tasks to be achieved on a contract.
B. It is difficult for the contractor to incorporate changes into a lump-sum type contract.
C. The contractor cannot account for re-work in their change control process.
D. Complex systems are conductive to the acceptance of changes.
將變更融于承包商復雜的系統中是困難和麻煩的。原因是:
A. 缺少關于要完成的項目任務的詳細信息
B. 對于承包商來說,把變更融入于一次性付款類型的合同中是很困難的
C. 承包商不能為他們在變更控制過程中的返工負責
D. 復雜的系統對于變更的驗收是有益的

16. Why is it difficult for the project manager, regardless of the industry, to standardize their management at the top three levels of the Work Breakdown Structure?
A. The difference between projects.
B. Documents that authorized and assign work to performing organizations are designated by various names.
C. The contractors, without customers input, specifies the upper three levels of the WBS
D. Too many WBS levels of a project create difficulty in integration of the work activities.
無論什么行業,為什么對于一個項目經理來說,把工作分解結構的最高三層進行標準化管理是困難的?
A. 項目間的差異
B. 用來將工作授權和分配給執行機構的文檔有著各種各樣的名稱
C. 承包商在沒有客戶參與的情況下,明確了工作分解結構的最高三層
D. 工作分解結構的過多層次,會給整個工作活動整合帶來難度

17. Each project phase is marked by completion of one or more:
A. tasks
B. milestones
C. deliverables
D. life cycles
每個項目的階段是以完成一個或者多個______ 為標志。
A. 任務
B. 里程碑
C. 交付物
D. 生命周期

18. What is an example of project integration?
A. Accounting provides the cost estimate required for the help center’s contingency plan.
B. Developing a single task.
C. Determining what the cost is of a single functional task.
D. A functional manager determining what resource to use from his/her functional group.
下面哪個是項目整合的一個例子?
A. 為救助中心提供應急計劃所需的成本估算的記賬體系
B. 制定一個單獨的任務
C. 確定一個單一功能任務的成本是多少
D. 職能部門的經理確定從他/她的部門中使用哪些資源

19. When should senior management perform periodic project reviews?
A. Completion of a milestone.
B. Completion of each life cycle phase.
C. When one functional group completes their tasks.
D. When an activity interface point is reached.
高層管理在何時進行階段性的項目檢查?
A. 完成一個里程碑時
B. 完成項目生命期的每個階段時
C. 當一個職能團隊完成他們的任務時
D. 在到達活動的交界點時

20. Setting strategic project objectives are the responsibility of the:
A. project manager
B. function manager
C. executive or user groups
D. client
制定項目戰略目標的責任歸屬
A. 項目經理
B. 部門經理
C. 執行官或用戶集團
D. 雇主

參考答案:

11-15         16-20

CDADA         ACABC

日韩精品一区二区三区三区免费_欧美理论片在线_久久精品人人做人人爽97 _欧美日韩亚洲视频

PMP團購導航
遠程PMP團購
北京PMP團購
上海PMP團購
廣州PMP團購
深圳PMP團購
江浙PMP團購
西部PMP團購
其他城市團購



PMP題庫
主站蜘蛛池模板: 91精品国产99| 亚洲一区尤物| 欧美日韩在线不卡视频| 精品综合久久久久久97| 欧美成人精品在线| 久久综合色88| 欧美激情网友自拍| 欧美 日韩 国产在线| 欧美在线视频a| 亚洲综合国产精品| 日韩一区二区三区资源| 婷婷久久五月天| 国产中文字幕日韩| 亚洲精品一区二区三| 久久亚洲精品国产亚洲老地址| 亚洲国产精品www| 久久久久亚洲精品| 久久天天躁狠狠躁夜夜av| 精品免费国产| 日韩精品欧美专区| 成人免费网站在线| 日本韩国在线不卡| 91精品国产91| 久久免费视频观看| 久久久久国产精品免费网站| www.色综合| 国产在线日韩在线| 日韩视频永久免费观看| 欧美日本在线视频中文字字幕| 国产精品视频久久久| 亚洲a级在线播放观看| 国产精品一香蕉国产线看观看| 亚洲综合五月天| 久久亚洲免费| 国产精品专区在线| 久久超碰亚洲| 91精品视频免费| 欧美日韩一区在线观看视频| 国产女人18毛片水18精品| 国产国产精品人在线视| 久久久久免费精品国产|