1. Velidate scope is a (an)
A. Planning process
B. Executing process
C. Monitoring and controlling process
D. Closing process
1. 確認范圍是一個
A. 規劃過程
B. 執行過程
C. 監控過程
D. 收尾過程

2. Perform quality assurance is a (an)
A. Planning process
B. Executing process
C. Monitoring and controlling process
D. Closing process
2. 實施質量保證是一個
A. 規劃過程
B. 執行過程
C. 監控過程
D. 收尾過程

3. Control quality is a (an)
A.Planning process
B.Executing process
C.Monitoring and controlling process
D.Closing process
3.控制質量是一個
A. 規劃過程
B. 執行過程
C. 監控過程
D. 收尾過程

4. The Project Procurement Management knowledge area includes all of the following EXCEPT:
A. Conduct procurements
B. Close procurements
C. Identify risks
D. Plan procurement management
4. 項目采購管理知識領域包含下面的過程,除了:
A. 實施采購
B. 結束采購
C. 識別風險
D. 規劃采購管理

5. All the following are true EXCEPT?
A. The project manager needs to determine the skills of the stakeholders.
B. The stakeholders’ impact on the project must be assessed.
C. The stakeholders do not have a role in determining the project plan unless they are part of theproject team.
D. Stakeholder management is part of the project plan.
5. 下面哪項說法不正確?
A. 項目經理需要判斷項目干系人的技能
B. 項目干系人對項目的影響必須被評估
C. 在決定項目計劃時不需要考慮項目干系人,除非他們是項目團隊的一部分
D. 項目干系人管理是項目計劃的一部分

6. Which of the following is the most proper?
A. A project charter is developed based on the preliminary project scope statement
B. Planning activities will start after the finish of initiating process group
C. Business needs are documented in the initiating processes,but project objectives are determined in the planning processes
D. At the time initiating process group occurs,planning activities also occur.
6. 下列哪一項是最合適的描述
A. 項目章程的制定是基于初步項目范圍說明書
B. 計劃活動開始于啟動過程組完成之后
C. 商務需求是在啟動過程進行文檔描述,但是項目目標是在計劃過程確定的
D. 在啟動過程進行時,計劃活動也在進行

7. The first phase of a project is the feasibility study.According to the PMBOK,which of the project management process group does the feasibility study phase need?
A. Planning
B. Planning , monitoring and controlling
C. Initiating and closing
D. Alln of five process groups
7. 項目的第一階段是可行性研究,根據PMBOK,可行性研究階段需要下面哪個項目管理過程組?
A. 計劃
B. 計劃和監控
C. 啟動和收尾
D. 所有5個過程組

8. Project management processes ensure the effective flow of the project throughout its existence. Product-oriented  processes specify and create the project's product. Therefore, project management process and product-oriented process
A. Overlap and interact throughout the project
B. Are defined by the project life cycle
C. Are concerned with describing and organizing project work
D. Are similar for each application area
8. 項目管理過程確保項目自始至終順利進行。 產品導向過程說明并創造項目產品。 因此項目管理過程和產品導向過程:
A. 是重疊的并且在整個項目期間是交互影響的
B. 由項目的周期決定的
C. 與對項目工作的描述和組織有關
D. 在每個應用領域都是類似的

9. Project management processes can be categorized into five groups. The process groups are linked by the results they produce. The outputs of one often become the input to another. What is the MOST appropriate sequence of the five project management process groups?
A. Initiating-planning-monitoring and controlling-executing-closing
B. Initiating-executing-monitoring and controlling-planning-closing
C. Initiating-planning-executing-monitoring and controlling-closing
D. Initiating-monitoring and controlling-planning-executing-closing
9. 項目管理過程可以劃分成5組。這5個過程通過它們產生的結構銜接起來,一個過程組的成果變成了另一個過程組的依據。這5個管理過程組最恰當的排序是什么?
A. 啟動-規劃-監控-執行-收尾
B. 啟動-執行-監控-規劃-收尾
C. 啟動-規劃-執行-監控-收尾
D. 啟動-監控-規劃-執行-收尾

10.  Within each process group, individual processes are linked by
A. The project manager.
B. Outputs.
C. Exit points
D. Chains
10. 每個過程組內,單個過程的銜接是通過:
A. 項目經理
B. 輸出
C. 出口點
D. 鏈


PMBOK指南(第5版)第三章習題 參考答案

1.
參考答案:C
知識要點:項目管理過程組與知識領域
資料來源:《PMBOK指南》第5版第61頁,或培訓講義第45頁

2.
參考答案:B
知識要點:項目管理過程組與知識領域
資料來源:《PMBOK指南》第5版第61頁,或培訓講義第45頁

3.
參考答案:C
知識要點:項目管理過程組與知識領域
資料來源:《PMBOK指南》第5版第61頁,或培訓講義第45頁

4.
參考答案:C
知識要點:項目管理過程組與知識領域
資料來源:《PMBOK指南》第5版第61頁,或培訓講義第45頁

5.
參考答案:C
知識要點:制定項目管理計劃,要鼓勵所有干系人參與
資料來源:《PMBOK指南》第5版第56頁,或培訓講義第47頁

6.
參考答案:D
知識要點:項目管理五大過程組是交叉重疊的
資料來源:《PMBOK指南》第5版第51頁,或培訓講義第43頁

7.
參考答案:D
知識要點:在每個階段中,會執行項目管理五大過程組
資料來源:《PMBOK指南》第5版第52頁,或培訓講義44頁

8.
參考答案:A
知識要點:項目管理過程和產品導向過程是重疊的
資料來源:《PMBOK指南》第5版第48頁,或培訓講義第40頁

9.
參考答案:C
知識要點:五大項目管理過程組的相互作用
資料來源:《PMBOK指南》第5版第53頁,或培訓講義第43頁

10.
參考答案:B
知識要點:一個過程的輸出會成為另外一個過程的輸入
資料來源:《PMBOK指南》第5版第52頁,或培訓講義第41頁

日韩精品一区二区三区三区免费_欧美理论片在线_久久精品人人做人人爽97 _欧美日韩亚洲视频

PMP團購導航
遠程PMP團購
北京PMP團購
上海PMP團購
廣州PMP團購
深圳PMP團購
江浙PMP團購
西部PMP團購
其他城市團購



PMP題庫
主站蜘蛛池模板: 国产福利久久精品| 懂色av一区二区三区四区五区| 欧美在线一区二区三区四| 欧美日本韩国国产| 国产精品久久久91| 国产精品美乳一区二区免费| 国产999在线观看| 久久久97精品| 欧美 日韩 国产在线观看| 欧美日韩亚洲一区二区三区四区| 久久久久久久久久久视频| 国产精品视频二| 国产美女在线精品免费观看| 国产精品裸体一区二区三区| 国产美女精品在线观看| 国产精品视频免费在线观看| 成人国产精品av| 久久精品午夜福利| 久久精品99久久| 欧美日韩一区二区三区在线视频| 日韩亚洲欧美中文在线| 精品国内产的精品视频在线观看| 日本三日本三级少妇三级66| 欧美日韩大片一区二区三区| www.午夜精品| 国产伦精品免费视频| 久久久国产一区二区三区| 日韩视频免费中文字幕| 久久人人爽人人爽人人片av高请 | 日韩av大片在线| 91精品久久久久| 亚洲伊人久久大香线蕉av| 久久免费视频观看| 亚洲视频在线观看日本a| 日韩一区在线视频| 热久久这里只有| 国外色69视频在线观看| 精品午夜一区二区三区| 国产精品极品在线| 免费国产成人看片在线| 国产日韩欧美在线|